Planning projects on time, on budget, and in line with your strategy.
Detailed Fiber Plant Engineering & Field Data Collection
Reduce Risk. Maximize Network Strength. Get the Best Construction Bids.
Preparing for construction demands thorough, detailed engineering to minimize risks, strengthen your network, and avoid unexpected issues in the field. Construction plans built with clarity, precision, and GIS-accurate maps lead to better construction bids and smoother execution.
Vantage Point’s in-house CAD team is experienced in all major mapping systems and continuously integrates new technology. From start to finish, we’re with you every step of the way.
- Field Engineering & Review
- Aerial Make-Ready Engineering & Pole Loading Analysis
- Detailed Construction Mapping
- Construction Specifications
- Bid Management
- Contractor Procurement
- Central Office Design
- Electronics RFP
- RUS/RDUP Standards
- Fully Electronic Field Staking (Buried & Aerial)
- Road Moves
- GIS Accurate Design Records
Aerial Plant Services
Reliable Solutions from the Ground Up
Vantage Point is a global leader in Pole Data Collection Technology—but that’s just the beginning. All aerial engineering and plant services are overseen by a Licensed Professional Engineer, ensuring your aerial plant’s integrity, safety, and compliance from start to finish.
- Aerial Engineering
- Pole Studies
- Pole Loading Analysis
- Easement Assistance
- Make Ready Management
- Pole Data Collection
- ADSS
- Strand/Lash
- Slack & Accessory Management
Outside Plant Bid Management
Ensuring Quality and Cost Efficiency
Finding the right balance between quality contractors and cost-effective bid pricing is crucial for major fiber construction projects. Vantage Point provides detailed contract specifications, pre-qualifies contractors, conducts pre-bid meetings, and oversees the formal bid opening and contract execution. Our process ensures you get a high-quality network built at the best price.
- OSP Construction Bid Requirements
- Detailed Guide Drawings
- Pre-Screening of OSP Contractors
- Invitations to Bid
- Pre-bid Meeting
- Bid Evaluations
- Coordination of Contract Execution
ROW, Easements & Permitting
Eliminating Delays by Clearing the Red Tape
Our team navigates and fulfills all necessary ROW, easement, and environmental requirements to avoid construction delays.
Jurisdictions
- Private Easements
- Aerial/Pole Applications & MRE
- Townships
- City
- County
- State
- Federal
- Tribal
- Railroad
Agencies & Entities
- Dept. of Transportation
- Bureau of Reclamation
- Bureau of Indian Affairs (BIA)
- Bureau of Land Management
- State & Tribal Historical Preservation
- US Forest Service
- Army Corps of Engineers
- Cultural Resource Reports
Environmental
- Dept. of Natural Resources
- Environmental Impact Studies
- Borrower’s Environmental Reports (BER)
- Storm Water Pollution Prevention Plan (SWPPP)
- Irrigation & Drainage Districts
- Biological Field Surveys
- Wetland Delineation Reports
- Geotechnical Soil / Bore Test Reports
Environmental & Cultural Resource Management
Red tape? We’ve got a shovel for that.
Decades of archeological, architectural, and environmental experience keep your project compliant and moving forward.